- Metallurgy Machinery[12]
- Metal Casting Machinery[10]
- Tie Mounts[2]
- Other Machinery[6]
- Mining Machinery[2]
- Industrial Furnace[10]
- Power Distribution Equipment[1]
- Other Motor[7]
- Cleaning Equipment[2]
- Other Electrical Equipment[2]
- Electronics Production Machinery[1]
- Grinding Machine[1]
- Metallurgy Machinery Parts[1]
- Other Metallurgy Machinery[6]
- Other Machine Tools Accessories[7]
- Chemical Product Machinery[1]
- Rolling Mill[4]
- Mining Machinery Parts[7]
- Cooling Tower[5]
- AC Motor[3]
- DC Motor[4]
- Frame[7]
- Transformers[8]
- Packaging Tube[6]
- Boilers[7]
- Other Metal Processing Machinery[2]
- Testing Equipment[1]
- Graphite Electrodes[2]
- Cast & Forged[2]
- Other Metals & Metal Products[1]
- Diesel Generators[6]
- Spectrum Analyzers[4]
- Carbon Analyzers[3]
- Chemical Transportation Equipment[4]
- Pumps[3]
- Other Living Room Furniture[1]
- Other Home Decor[1]
- Furniture Handles & Knobs[2]
- Printing Inks[4]
- Copper Strips[3]
- Hoists[1]
- Contact Person : Mr. Robin Yan
- Company Name : Shanghai Electrical Machinery Group Co., Ltd.
- Tel : 86-21-60484485
- Fax : 86-21-59191323
- Address : Shanghai,Shanghai,218 Fengxian Road
- Country/Region : China
- Zip : 200041
Dynamic Balancing Machine
Following is the features and installation of the Dynamic Balancing Machine:
A. Performance features
The characteristics of YYW-1000 type GQB-TC-208 Electromechanical system of bearing balancing machine:
1. using the microprocessor-based digital display
2. the measuring system adopt to digital and analog integrated circuits, stable function and reliable
3. electromechanical transducers using Piezoelectric sensor which is characterized by good output precision, stable and reliable function.
4. using dual-channel measuring system, simple operation, fast measurement.
B. Installation and adjustment
The installation should possible to avoiding the interference of external vibration source and strong power, such as crane or other machine frequent start and stop all affect the spot instantaneous. So it is better to attach the power supply in the little power interference circuit. After pouring the foundation, you should based on the concrete dry speed condition, when the concrete becomes solid, then you should install the balancing machine to the foundation with using the air level to calibration standards and within the requirements of horizontal and two direction that reach 0.2/1000. Fastened the foundation nut and the gap you should fill to the full with concrete
Dynamic Balancing Machine